Added Time: 2022/8/22 10:55:03 Views: 1368
How much time does it take to invest in a water park? From the beginning to the final operation of the water park, it takes as little as two months and as much as half a year. During this period, it is necessary to go through the stages of market inspection, manufacturer inspection, equipment installation, purchase and trial operation. So let's take a closer look at what needs to be done to invest in a water park.
This article contains the following
1. Investigate the market
2. Select the manufacturer
3. Device installation
4. Trial operation
First, examine the market
If you want to invest in a water park, you need to understand the consumer population of the entire water park market and the overall development status, so what do you need to know? First, what is the per capita consumption level of the water park venue you want to invest in?

What is the proportion of students and the proportion of adults in the population base? Secondly, local rents, personnel costs, utilities and utilities are all proportions. In fact, invest in water parks to try to choose a blank market area, if the water park market tends to saturation, then the competitive pressure on you will be very large.
Second, choose the manufacturer
It is very important to choose a manufacturer that integrates design and production and installation, we cannot only conduct a manufacturer's inspection, we will make a comprehensive comparison of all manufacturers, compare equipment quality, comprehensive price, after-sales service, etc., in fact, as long as it is able to go to the field, in order to meet their real needs. At the same time, the products designed by manufacturers also need to be personally experienced, and understanding the needs of tourists is the focus of real investment. All the expeditions are divided into half a month.
Third, equipment installation
How long does it take to invest in a water park? When the equipment begins to place orders, it needs to be designed, produced, installed, transported, commissioned, etc. In the installation of the need to find professional technical personnel, according to the size of each product for the construction and debugging of the product, the process takes about 15 days, of course, in the early design of the time also takes time.

4. Trial operation
When all the projects are going very smoothly, they also need to pass the inspection of the relevant departments, which takes about a week, so from the very beginning, we want to invest in the water park, and it will take about two to three months to be able to successfully test the operation process in the later stage.
How long does it take to invest in a water park? Of course, you can't be fully on the market after it is established, you need to have a process of adaptation, first let users know about your water park and the comfort experience, this process can be set in a quarter, according to their own actual plan can be carried out.
We take on complete outdoor play planning for scenic areas, parks and communities, covering stainless-steel slides, combined play equipment, climbing structures and landscape features, from design through to delivery.
Our own established supply chain and ample stock, together with complete production and installation equipment and standardised processes, keep projects on schedule and firmly delivered.
With customer needs at the centre, our professional technical team and rigorous service process refine every play scheme and product, and we put real care into every installation.
We follow industry production codes and safety standards closely, controlling every stage from material selection and production to installation and acceptance, so play sites get dependable quality assurance.
Our own large-scale plant focuses on the R&D and production of combined slides, outdoor fitness equipment, climbing structures and water play equipment, cutting out the middlemen.
Our experienced design and engineering team has solid practical ability in scheme design, site planning and project delivery, and can meet custom requirements across many kinds of site.
After years in the industry we have completed more than a hundred installations across many regions, with a mature project service and after-sales maintenance system.
Leji is deeply rooted in non-powered play. Guided by the core idea of quality play, and with quality products and creative full-service support, we create comfortable, rich play experiences for many kinds of site.
Confirm the scheme, sign the contract and start project liaison
On-site construction and installation, commissioning and acceptance, then project handover
Ongoing maintenance and regular inspection services
浙公网安备 33032402002190号 浙ICP备2020037960号-1 XML Sitemap